Screw: | Single-Screw |
---|---|
Automation: | Automation |
Computerized: | Computerized |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1, Senior technical engineer with more than 15 years of experience in the polymer filtration fields and waste recycling fields
2, Cooperate with the factory fully equipped with all needed fabricating machinery,guattantee the quality and the date of delivery of the products.
3,Customized design is welcome
4,Quick delivery time
5,OEM service is provided
6,Reliable and trustworthy service
High quality plastic recycling machine used pelletizer
Quality advantages
1,Optimization of the particle shape,more smooth, uniform particles, such as water droplets or spherical
2,High particle density, good liquidity
3,Prevent oxidation of the granules
4,Less bonding phenomenon
5,More convenient operation; production and operating experience
6,A key to boot, automatic continuous production
7,Superhard alloy die two years warranty
8,Without sharpening the blade without replacement within a year and polished
9,Shorten the curing /solidify time, less space and cooling water demand
10.Full closed production. Enviorment friendly
11,low noise, no dull pollotion
Pelletizer type and parameter
This series pelletizers are high quality ,all the sparep arts are adopted the best quality meet the requirement of international .
Model |
Rotating knife dia.×L (mm) |
Motor Power (KW) |
Max Output (kg/h) |
Particle Size (mm) |
GM-PA-120 |
Ø120×150mm |
3.7KW |
≤300 |
Ø3×3 |
GM-PA-150 |
Ø150×200mm |
5.5KW |
≤600 |
Ø3×3 |
GM-PA-180 |
Ø180×250mm |
7.5KW |
≤1000 |
Ø3×3 |
Pictures of the pelletizer
Commissioning
We provide the operation manual for customers to gudie to install the screen changer, and at the requirement of user, salers should send technician to install and commissioning the die at site of Buyers, expenses of the trip should be borne by Buyers.
After-sales service
12 months with proper operation by user, all the spare parts shall be replaced free of charge under guarantee period, fee for transportation and packing will be borne by users.